{"id":11386,"date":"2014-02-24T16:26:54","date_gmt":"2014-02-24T16:26:54","guid":{"rendered":"http:\/\/copades.com\/monec\/?p=11386"},"modified":"2014-02-24T16:26:54","modified_gmt":"2014-02-24T16:26:54","slug":"en-proyecto-32-centrales-generadoras","status":"publish","type":"post","link":"https:\/\/copades.com\/monec\/?p=11386","title":{"rendered":"En proyecto 32 centrales generadoras"},"content":{"rendered":"<p style=\"text-align: justify;\">El pa\u00eds cuenta con al menos 32 proyectos de hidroel\u00e9ctricas nuevas, con un total de 1,128 megavatios de capacidad en diferentes fases de desarrollo, que van desde construcci\u00f3n hasta autorizaciones pendientes para instalarse. Con un potencial de recurso h\u00eddrico para generar hasta cinco mil megavatios, Guatemala apenas aprovecha el 18.0% con las 20 hidroel\u00e9ctricas que operan en el pa\u00eds, las cuales tienen capacidad de generaci\u00f3n de 937.50 MW. Sin embargo, seg\u00fan el inventario de proyectos que posee el Ministerio de Energ\u00eda y Minas (MEM), actualizado al 18 de febrero \u00faltimo y que incluye los proyectos de m\u00e1s de cinco megavatios (MW), hay en construcci\u00f3n ocho proyectos con capacidad de 369.97 MW. Adem\u00e1s, se cuenta con 19 proyectos autorizados que no han empezado su construcci\u00f3n, con capacidad de 648.85 MW; y otros cinco en tr\u00e1mite, por 109.33 MW. (Prensa Libre 24.02.14)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>El pa\u00eds cuenta con al menos 32 proyectos de hidroel\u00e9ctricas nuevas, con un total de 1,128 megavatios de capacidad en diferentes fases de desarrollo, que van desde construcci\u00f3n hasta autorizaciones pendientes para instalarse. Con&#46;&#46;&#46;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5,14],"tags":[105],"class_list":["post-11386","post","type-post","status-publish","format-standard","hentry","category-actividad-productiva","category-energia-electrica","tag-mem"],"_links":{"self":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/11386","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=11386"}],"version-history":[{"count":1,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/11386\/revisions"}],"predecessor-version":[{"id":11387,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/11386\/revisions\/11387"}],"wp:attachment":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=11386"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=11386"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=11386"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}