{"id":28590,"date":"2016-10-12T12:00:45","date_gmt":"2016-10-12T18:00:45","guid":{"rendered":"http:\/\/copades.com\/monec\/?p=28590"},"modified":"2016-10-12T12:00:45","modified_gmt":"2016-10-12T18:00:45","slug":"desconectan-al-pais-del-siepac","status":"publish","type":"post","link":"https:\/\/copades.com\/monec\/?p=28590","title":{"rendered":"Desconectan al pa\u00eds del Siepac"},"content":{"rendered":"<p style=\"text-align: justify;\">Por m\u00e1s de dos d\u00edas, Guatemala fue desconectada del Sistema El\u00e9ctrico Regional de Centroam\u00e9rica por el Ente Operador Regional (EOR) y qued\u00f3 aislada del resto de pa\u00edses de la regi\u00f3n, unidos por el Sistema de Interconexi\u00f3n El\u00e9ctrica de los Pa\u00edses de Am\u00e9rica Central (Siepac), raz\u00f3n por la que se restringieron las exportaciones de energ\u00eda. La desconexi\u00f3n abrupta sorprendi\u00f3 al sector el\u00e9ctrico nacional, debido a que no hubo una advertencia previa. El argumento del EOR es que desde el 3 de octubre se importa 230 megavatios (MW) desde M\u00e9xico, niveles superiores a los 120 MW autorizados en forma t\u00e9cnica, por lo que orden\u00f3 al Administrador del Mercado Mayorista (AMM) que no supere ese volumen. (Prensa \u00a0Libre 12.10.16)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Por m\u00e1s de dos d\u00edas, Guatemala fue desconectada del Sistema El\u00e9ctrico Regional de Centroam\u00e9rica por el Ente Operador Regional (EOR) y qued\u00f3 aislada del resto de pa\u00edses de la regi\u00f3n, unidos por el Sistema&#46;&#46;&#46;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5,14],"tags":[5182,2999,341,2896,5213,1083,340,4440,5212],"class_list":["post-28590","post","type-post","status-publish","format-standard","hentry","category-actividad-productiva","category-energia-electrica","tag-actividad-productiva","tag-administrador-del-mercado-mayorista","tag-amm","tag-energia-electrica-2","tag-ente-operador-regional","tag-eor","tag-siepac","tag-sistema-de-interconexion-electrica-de-los-paises-de-america-central","tag-sistema-electrico-regional-de-centroamerica"],"_links":{"self":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/28590","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=28590"}],"version-history":[{"count":1,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/28590\/revisions"}],"predecessor-version":[{"id":28591,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/28590\/revisions\/28591"}],"wp:attachment":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=28590"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=28590"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=28590"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}