{"id":28637,"date":"2016-10-15T12:23:29","date_gmt":"2016-10-15T18:23:29","guid":{"rendered":"http:\/\/copades.com\/monec\/?p=28637"},"modified":"2016-10-17T12:40:35","modified_gmt":"2016-10-17T18:40:35","slug":"seguiria-la-desconexion-electrica","status":"publish","type":"post","link":"https:\/\/copades.com\/monec\/?p=28637","title":{"rendered":"Seguir\u00eda la desconexi\u00f3n el\u00e9ctrica"},"content":{"rendered":"<p style=\"text-align: justify;\">La medida de desconectar a Guatemala del resto de la red del Sistema de Interconexi\u00f3n El\u00e9ctrica de los Pa\u00edses de Am\u00e9rica Central (Siepac) continuar\u00e1, anunci\u00f3 el Ente Operador Regional (EOR). La encargada de operar la red del Siepac refiri\u00f3, en un bolet\u00edn, que de mantener Guatemala las importaciones de energ\u00eda desde M\u00e9xico mayores a los 120 megavatios (MW) aprobados seguir\u00e1n con las medidas necesarias para proteger el suministro del \u00e1rea.\u00a0 Dicho volumen subi\u00f3 porque entr\u00f3 en operaci\u00f3n Energ\u00eda del Caribe, firma que vende generaci\u00f3n con gas desde M\u00e9xico.\u00a0 Sin embargo, el EOR refiri\u00f3 que esa empresa a\u00fan no ha presentado los estudios t\u00e9cnicos establecidos por la regulaci\u00f3n regional. Se\u00f1ala al operador nacional, Administrador del Mercado Mayorista (AMM), de omitir la instrucci\u00f3n de no conectar la nueva instalaci\u00f3n que se deben hacer las modificaciones a la legislaci\u00f3n vigente. (Prensa Libre 15.10.16)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>La medida de desconectar a Guatemala del resto de la red del Sistema de Interconexi\u00f3n El\u00e9ctrica de los Pa\u00edses de Am\u00e9rica Central (Siepac) continuar\u00e1, anunci\u00f3 el Ente Operador Regional (EOR). La encargada de operar&#46;&#46;&#46;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5,14],"tags":[5182,2999,341,2896,5213,1083,87,340,4440],"class_list":["post-28637","post","type-post","status-publish","format-standard","hentry","category-actividad-productiva","category-energia-electrica","tag-actividad-productiva","tag-administrador-del-mercado-mayorista","tag-amm","tag-energia-electrica-2","tag-ente-operador-regional","tag-eor","tag-mexico","tag-siepac","tag-sistema-de-interconexion-electrica-de-los-paises-de-america-central"],"_links":{"self":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/28637","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=28637"}],"version-history":[{"count":1,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/28637\/revisions"}],"predecessor-version":[{"id":28638,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/28637\/revisions\/28638"}],"wp:attachment":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=28637"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=28637"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=28637"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}