{"id":31128,"date":"2017-05-23T16:08:46","date_gmt":"2017-05-23T22:08:46","guid":{"rendered":"http:\/\/copades.com\/monec\/?p=31128"},"modified":"2017-05-23T16:08:46","modified_gmt":"2017-05-23T22:08:46","slug":"pais-sigue-sin-poder-exportar-mas-energia","status":"publish","type":"post","link":"https:\/\/copades.com\/monec\/?p=31128","title":{"rendered":"Pa\u00eds sigue sin poder exportar m\u00e1s energ\u00eda"},"content":{"rendered":"<p style=\"text-align: justify;\">Lejos de solucionarse la desconexi\u00f3n de Guatemala con el Sistema de Interconexi\u00f3n El\u00e9ctrica de los Pa\u00edses de Am\u00e9rica Central (Siepac), que restringe la exportaci\u00f3n a la regi\u00f3n, el problema se agrav\u00f3 en los \u00faltimos dos meses. Durante abril y lo que va de mayo, ha habido interrupci\u00f3n en 16 ocasiones que suman 192 horas. Los pa\u00edses m\u00e1s impactados por no recibir esa energ\u00eda son El Salvador y Honduras, que son los mayores compradores, mientras que en Guatemala los afectados son los generadores, que pierden la oportunidad de poder venderla. <strong>Horacio Fern\u00e1ndez<\/strong>, director ejecutivo de la Asociaci\u00f3n Nacional de Generadores (ANG), refiri\u00f3 que ayer se hab\u00eda programado exportar cuatro mil 730 megavatios\/hora, pero no fue posible. Datos del Administrador del Mercado Mayorista (AMM) indican que de octubre del 2016 al 17 de mayo de este a\u00f1o se dejaron de despachar 60 mil 812.8 megavatios\/hora respecto de lo programado para las fechas en que se desconect\u00f3 al pa\u00eds. (Prensa Libre 23.05.17)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Lejos de solucionarse la desconexi\u00f3n de Guatemala con el Sistema de Interconexi\u00f3n El\u00e9ctrica de los Pa\u00edses de Am\u00e9rica Central (Siepac), que restringe la exportaci\u00f3n a la regi\u00f3n, el problema se agrav\u00f3 en los \u00faltimos&#46;&#46;&#46;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5,14],"tags":[5182,2999,341,2615,2974,2896,85,340,4440],"class_list":["post-31128","post","type-post","status-publish","format-standard","hentry","category-actividad-productiva","category-energia-electrica","tag-actividad-productiva","tag-administrador-del-mercado-mayorista","tag-amm","tag-ang","tag-asociacion-nacional-de-generadores","tag-energia-electrica-2","tag-guatemala","tag-siepac","tag-sistema-de-interconexion-electrica-de-los-paises-de-america-central"],"_links":{"self":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/31128","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=31128"}],"version-history":[{"count":1,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/31128\/revisions"}],"predecessor-version":[{"id":31129,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/31128\/revisions\/31129"}],"wp:attachment":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=31128"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=31128"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=31128"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}