{"id":31631,"date":"2017-07-13T12:11:27","date_gmt":"2017-07-13T18:11:27","guid":{"rendered":"http:\/\/copades.com\/monec\/?p=31631"},"modified":"2017-07-13T12:11:27","modified_gmt":"2017-07-13T18:11:27","slug":"piden-revisar-sistemas-electricos","status":"publish","type":"post","link":"https:\/\/copades.com\/monec\/?p=31631","title":{"rendered":"Piden revisar sistemas el\u00e9ctricos"},"content":{"rendered":"<p style=\"text-align: justify;\">Desde enero han ocurrido seis fallas en el sistema el\u00e9ctrico regional que afectan desde el sur de Centroam\u00e9rica con alcances en la red nacional. La \u00faltima ocurrida el 1 de julio dej\u00f3 p\u00e9rdidas econ\u00f3micas por Q6 millones, indic\u00f3 Gabriela de la Roca, directora del Administrador del Mercado Mayorista (AMM). Guatemala solicit\u00f3 al Ente Operador Regional (EOR), que administra la red de la interconexi\u00f3n el\u00e9ctrica de Centroam\u00e9rica, que adem\u00e1s de explicar por qu\u00e9 ocurren las fallas, aplique los criterios de seguridad para evitar que contin\u00faen ocurriendo, inform\u00f3 De la Roca. En octubre del a\u00f1o pasado el EOR desconect\u00f3 a Guatemala de la red debido a que consider\u00f3 que con el ingreso de la operaci\u00f3n de Energ\u00eda del Caribe se sobrepasaba el l\u00edmite de 230 megavatios (MW) considerado como un valor seguro y significaba un riesgo para el Sistema El\u00e9ctrico Regional (SER). Asimismo, exigi\u00f3 estudios el\u00e9ctricos para esa operaci\u00f3n que se sum\u00f3 al sistema. De esa cuenta, Guatemala ahora espera que el EOR aplique la regulaci\u00f3n regional y exija que se garanticen los par\u00e1metros de seguridad para evitar que contin\u00faen las fallas t\u00e9cnicas. (El Peri\u00f3dico 13.07.17)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Desde enero han ocurrido seis fallas en el sistema el\u00e9ctrico regional que afectan desde el sur de Centroam\u00e9rica con alcances en la red nacional. La \u00faltima ocurrida el 1 de julio dej\u00f3 p\u00e9rdidas econ\u00f3micas&#46;&#46;&#46;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5,14],"tags":[5182,2999,341,88,2896,5213,1083],"class_list":["post-31631","post","type-post","status-publish","format-standard","hentry","category-actividad-productiva","category-energia-electrica","tag-actividad-productiva","tag-administrador-del-mercado-mayorista","tag-amm","tag-centroamerica","tag-energia-electrica-2","tag-ente-operador-regional","tag-eor"],"_links":{"self":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/31631","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=31631"}],"version-history":[{"count":1,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/31631\/revisions"}],"predecessor-version":[{"id":31632,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/31631\/revisions\/31632"}],"wp:attachment":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=31631"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=31631"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=31631"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}