{"id":31672,"date":"2017-07-21T10:15:17","date_gmt":"2017-07-21T16:15:17","guid":{"rendered":"http:\/\/copades.com\/monec\/?p=31672"},"modified":"2017-07-21T10:33:09","modified_gmt":"2017-07-21T16:33:09","slug":"comision-regional-de-electricidad-ordena-al-pais-asumir-costos","status":"publish","type":"post","link":"https:\/\/copades.com\/monec\/?p=31672","title":{"rendered":"Comisi\u00f3n regional de electricidad ordena al pa\u00eds asumir costos"},"content":{"rendered":"<p>La Comisi\u00f3n Regional de Interconexi\u00f3n El\u00e9ctrica (Crie), ente regulador de energ\u00eda del \u00e1rea,<br \/>\nemiti\u00f3 una resoluci\u00f3n que generar\u00eda sobrecostos para los consumidores de Guatemala. Esa<br \/>\nresoluci\u00f3n (30-2017) ordena al Administrador del Mercado Mayorista (AMM), operador<br \/>\nel\u00e9ctrico nacional, que debe asumir los costos del sistema regional, ya que se desconect\u00f3<br \/>\nvarias veces a Guatemala del resto del \u00e1rea al superar el l\u00edmite de 120 megavatios que,<br \/>\nseg\u00fan el Ente Operador Regional (EOR), puede importar el pa\u00eds desde M\u00e9xico. El EOR ha<br \/>\ndecidido desconectar a Guatemala en varias ocasiones durante el a\u00f1o por sobrepasar<br \/>\nese l\u00edmite, con el argumento de que no se ha hecho un estudio t\u00e9cnico para definir que<br \/>\nvol\u00famenes mayores no ponen en riesgo el resto del sistema del \u00e1rea, decisiones que han<br \/>\nsido impugnadas por el AMM. (PL 18.07.17)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>La Comisi\u00f3n Regional de Interconexi\u00f3n El\u00e9ctrica (Crie), ente regulador de energ\u00eda del \u00e1rea, emiti\u00f3 una resoluci\u00f3n que generar\u00eda sobrecostos para los consumidores de Guatemala. Esa resoluci\u00f3n (30-2017) ordena al Administrador del Mercado Mayorista (AMM),&#46;&#46;&#46;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[14],"tags":[341,1336,3098,1083],"class_list":["post-31672","post","type-post","status-publish","format-standard","hentry","category-energia-electrica","tag-amm","tag-crie","tag-electricidad","tag-eor"],"_links":{"self":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/31672","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=31672"}],"version-history":[{"count":4,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/31672\/revisions"}],"predecessor-version":[{"id":31676,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/31672\/revisions\/31676"}],"wp:attachment":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=31672"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=31672"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=31672"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}