{"id":32229,"date":"2017-09-14T11:35:59","date_gmt":"2017-09-14T17:35:59","guid":{"rendered":"http:\/\/copades.com\/monec\/?p=32229"},"modified":"2017-09-14T11:35:59","modified_gmt":"2017-09-14T17:35:59","slug":"mem-sin-definir-la-solicitud-de-prorroga-que-pidio-trecsa","status":"publish","type":"post","link":"https:\/\/copades.com\/monec\/?p=32229","title":{"rendered":"MEM sin definir la solicitud de pr\u00f3rroga que pidi\u00f3 Trecsa"},"content":{"rendered":"<p>La tercera pr\u00f3rroga solicitada por la compa\u00f1\u00eda Transportadora de Energ\u00eda de Centroam\u00e9rica (Trecsa) para completar los trabajos del Plan de Expansi\u00f3n del Sistema de Transporte (PET) sigue bajo an\u00e1lisis del Ministerio de Energ\u00eda y Minas (MEM). Se han tenido reuniones con personeros de la empresa y de la Comisi\u00f3n Nacional de Energ\u00eda El\u00e9ctrica (CNEE) y a\u00fan no se ha dado la pr\u00f3rroga, declar\u00f3 ayer el encargado de la cartera, Luis Chang Navarro. Trecsa, filial del Grupo Energ\u00eda de Bogot\u00e1 obtuvo la construcci\u00f3n del PET-01-2009 que incluye 846 kil\u00f3metros de l\u00edneas de transmisi\u00f3n y la construcci\u00f3n o ampliaci\u00f3n de subestaciones. El avance de las obras del PET-01-2009 superan el 69 por ciento e incluyen 14 subestaciones energizadas, 19 de 23 subestaciones construidas, 463 kil\u00f3metros construidos y 77 por ciento de las servidumbres adquiridas. (EP\/PL\/DCA 14.09.17)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>La tercera pr\u00f3rroga solicitada por la compa\u00f1\u00eda Transportadora de Energ\u00eda de Centroam\u00e9rica (Trecsa) para completar los trabajos del Plan de Expansi\u00f3n del Sistema de Transporte (PET) sigue bajo an\u00e1lisis del Ministerio de Energ\u00eda y&#46;&#46;&#46;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[14],"tags":[105,1611,1056],"class_list":["post-32229","post","type-post","status-publish","format-standard","hentry","category-energia-electrica","tag-mem","tag-pet","tag-trecsa"],"_links":{"self":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/32229","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=32229"}],"version-history":[{"count":1,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/32229\/revisions"}],"predecessor-version":[{"id":32230,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/32229\/revisions\/32230"}],"wp:attachment":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=32229"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=32229"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=32229"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}