{"id":35008,"date":"2018-07-02T15:15:30","date_gmt":"2018-07-02T21:15:30","guid":{"rendered":"http:\/\/copades.com\/monec\/?p=35008"},"modified":"2018-07-02T15:15:30","modified_gmt":"2018-07-02T21:15:30","slug":"comunas-pagaran-q78-millones-al-inde","status":"publish","type":"post","link":"https:\/\/copades.com\/monec\/?p=35008","title":{"rendered":"Comunas pagar\u00e1n Q78 millones al Inde"},"content":{"rendered":"<p style=\"text-align: justify;\">Mediante contratos de reconocimiento de deuda, el Instituto Nacional de Electrificaci\u00f3n (Inde) asegur\u00f3 la recuperaci\u00f3n de Q78 millones 814 mil en el mediano plazo, por el suministro de energ\u00eda brindado a 4 de las 14 empresas el\u00e9ctricas municipales que atiende. De acuerdo con informaci\u00f3n proporcionada por la Gerencia de Comunicaci\u00f3n Corporativa del Inde, este a\u00f1o recibir\u00e1n un primer pago por Q1 mill\u00f3n 441 mil de la Empresa El\u00e9ctrica Municipal (EEM) de San Marcos, quien firm\u00f3 en diciembre de 2017 un contrato por Q18 millones 735 mil, a un plazo de 13 a\u00f1os. Derivado de ese compromiso, la comuna pag\u00f3 Q21 millones 288 mil en el momento de la suscripci\u00f3n del documento. Mientras tanto, la EEM de San Pedro Sacatep\u00e9quez firm\u00f3 un convenio por Q21 millones 174 mil, de una deuda\u00a1 total de Q23 millones 644 hasta el 11 de mayo de este a\u00f1o. Asimismo, la EEM de Zacapa asumi\u00f3 una obligaci\u00f3n por Q10 millones 481 mil, de un total de Q97 millones 607 mil, que corresponden al consumo de enero 2017 a marzo de 2018, mientras que la EEM de Guastatoya adquiri\u00f3 un compromiso por Q28 millones 423 mil, de los Q95 millones 925 mil que adeuda. (DCA 02.07.18)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Mediante contratos de reconocimiento de deuda, el Instituto Nacional de Electrificaci\u00f3n (Inde) asegur\u00f3 la recuperaci\u00f3n de Q78 millones 814 mil en el mediano plazo, por el suministro de energ\u00eda brindado a 4 de las&#46;&#46;&#46;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[14],"tags":[5209,85,292],"class_list":["post-35008","post","type-post","status-publish","format-standard","hentry","category-energia-electrica","tag-eem","tag-guatemala","tag-inde"],"_links":{"self":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/35008","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=35008"}],"version-history":[{"count":1,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/35008\/revisions"}],"predecessor-version":[{"id":35009,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/35008\/revisions\/35009"}],"wp:attachment":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=35008"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=35008"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=35008"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}