{"id":38989,"date":"2019-07-19T10:15:15","date_gmt":"2019-07-19T16:15:15","guid":{"rendered":"http:\/\/copades.com\/monec\/?p=38989"},"modified":"2019-07-19T10:15:15","modified_gmt":"2019-07-19T16:15:15","slug":"nueva-prorroga-en-contrato-de-energia","status":"publish","type":"post","link":"https:\/\/copades.com\/monec\/?p=38989","title":{"rendered":"Nueva pr\u00f3rroga en contrato de energ\u00eda"},"content":{"rendered":"<p style=\"text-align: justify;\">Una vez m\u00e1s, el Instituto Nacional de Electrificaci\u00f3n (Inde) aplaz\u00f3 la fecha de recepci\u00f3n de ofertas para contratar la instalaci\u00f3n, operaci\u00f3n y suministro de energ\u00eda con cinco generadoras por hasta cien megavatios. Seg\u00fan el cronograma de la licitaci\u00f3n, para ayer estaba programada la recepci\u00f3n de ofertas; sin embargo, el Consejo Directivo del Inde decidi\u00f3 aplazarla para atender las solicitudes de las empresas interesadas, que pidieron m\u00e1s tiempo. La nueva fecha se estableci\u00f3 para el 31 de julio pr\u00f3ximo. Hay 14 empresas interesadas en el proyecto, las cuales participaron en las diferentes visitas t\u00e9cnicas que se efectuaron a las \u00e1reas donde se requiere instalar las generadoras de energ\u00eda solar, agreg\u00f3 ese ente. El monto de inversi\u00f3n en el proyecto podr\u00eda ser de entre US$100 millones y US$120 millones. (Prensa Libre 19.07.19)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Una vez m\u00e1s, el Instituto Nacional de Electrificaci\u00f3n (Inde) aplaz\u00f3 la fecha de recepci\u00f3n de ofertas para contratar la instalaci\u00f3n, operaci\u00f3n y suministro de energ\u00eda con cinco generadoras por hasta cien megavatios. Seg\u00fan el&#46;&#46;&#46;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5,14],"tags":[3585,292],"class_list":["post-38989","post","type-post","status-publish","format-standard","hentry","category-actividad-productiva","category-energia-electrica","tag-energia-solar","tag-inde"],"_links":{"self":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/38989","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=38989"}],"version-history":[{"count":1,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/38989\/revisions"}],"predecessor-version":[{"id":38991,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/38989\/revisions\/38991"}],"wp:attachment":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=38989"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=38989"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=38989"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}