{"id":39121,"date":"2019-07-27T10:50:15","date_gmt":"2019-07-27T16:50:15","guid":{"rendered":"http:\/\/copades.com\/monec\/?p=39121"},"modified":"2019-07-29T10:51:39","modified_gmt":"2019-07-29T16:51:39","slug":"piden-al-inde-que-desista-en-compras-de-energia","status":"publish","type":"post","link":"https:\/\/copades.com\/monec\/?p=39121","title":{"rendered":"Piden al INDE que desista en compras de energ\u00eda"},"content":{"rendered":"<p style=\"text-align: justify;\"><strong>Luis Chang Navarro<\/strong>, ministro de Energ\u00eda y Minas, y presidente del Consejo Directivo del Instituto Nacional de Electrificaci\u00f3n (INDE), no logr\u00f3 presentar argumentos suficientes para defender las compras de energ\u00eda que busca firmar para los siguientes 20 a\u00f1os. Durante una citaci\u00f3n con la bancada Unidad Nacional de la Esperanza (UNE), Chang y los integrantes de la directiva del INDE se mostraron divididos por la licitaci\u00f3n para comprar 110 megavatios (MW) de energ\u00eda solar y la autorizaci\u00f3n para adquirir 5 millones de pies c\u00fabicos de gas natural para generaci\u00f3n el\u00e9ctrica. Sergio Sosa y Edwin Escobar Hill, representantes de las c\u00e1maras empresariales y de la Asociaci\u00f3n Nacional de Municipalidades (Anam), respectivamente, cuestionan los procesos y han solicitado en varias ocasiones que se suspendan. La construcci\u00f3n de los sistemas de generaci\u00f3n solar fotovoltaico, seg\u00fan las bases publicadas en Guatecompras, se har\u00e1 bajo la modalidad de Build Operate Transfer (BOT), hecho cuestionado por Sosa y Escobar pues se obligar\u00eda al INDE comprar los activos del proyecto luego de 20 a\u00f1os, cuando han perdido la vida \u00fatil los paneles, adem\u00e1s de que se utiliza una figura regulada en la legislaci\u00f3n para alianzas p\u00fablico-privadas. (El Peri\u00f3dico\/Prensa Libre 27.07.19)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Luis Chang Navarro, ministro de Energ\u00eda y Minas, y presidente del Consejo Directivo del Instituto Nacional de Electrificaci\u00f3n (INDE), no logr\u00f3 presentar argumentos suficientes para defender las compras de energ\u00eda que busca firmar para&#46;&#46;&#46;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5,14],"tags":[6772,292,1679,612],"class_list":["post-39121","post","type-post","status-publish","format-standard","hentry","category-actividad-productiva","category-energia-electrica","tag-bot","tag-inde","tag-mw","tag-une"],"_links":{"self":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/39121","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=39121"}],"version-history":[{"count":1,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/39121\/revisions"}],"predecessor-version":[{"id":39122,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/39121\/revisions\/39122"}],"wp:attachment":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=39121"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=39121"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=39121"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}