{"id":40092,"date":"2019-10-25T10:38:23","date_gmt":"2019-10-25T16:38:23","guid":{"rendered":"http:\/\/copades.com\/monec\/?p=40092"},"modified":"2019-10-28T10:39:55","modified_gmt":"2019-10-28T16:39:55","slug":"trecsa-duplica-capacidad-de-transporte-de-energia","status":"publish","type":"post","link":"https:\/\/copades.com\/monec\/?p=40092","title":{"rendered":"Trecsa duplica capacidad de transporte de energ\u00eda"},"content":{"rendered":"<p style=\"text-align: justify;\">Con la energizaci\u00f3n del segundo circuito Aguacapa-La Vega II, de la subestaci\u00f3n La Vega II, ubicada en Barberena, Santa Rosa, la Transportadora de Energ\u00eda de Centroam\u00e9rica, S. A. (Trecsa) duplica su capacidad de conducci\u00f3n, al pasar de 360 a 720 megavoltiamperios (MVA). La compa\u00f1\u00eda invirti\u00f3 US $1 mill\u00f3n 300 mil (Q10.08 millones) en la ampliaci\u00f3n del proyecto, que es parte de las obras del Plan de Expansi\u00f3n de Transmisi\u00f3n (PET-01-2009), cuya primera fase finaliz\u00f3 en 2014, indic\u00f3 Mauricio Acevedo, gerente general de Trecsa. Acevedo refiri\u00f3 que la obra energ\u00e9tica viene a reforzar las operaciones en el Sistema Nacional Interconectado, beneficiando a la poblaci\u00f3n del centro y suroriente de Guatemala. Asimismo, fortalece la Red de Transmisi\u00f3n Regional, ya que la subestaci\u00f3n La Vega II se conecta con la subestaci\u00f3n Ahuachap\u00e1n, en El Salvador. (Diario de Centro Am\u00e9rica 25.10.19)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Con la energizaci\u00f3n del segundo circuito Aguacapa-La Vega II, de la subestaci\u00f3n La Vega II, ubicada en Barberena, Santa Rosa, la Transportadora de Energ\u00eda de Centroam\u00e9rica, S. A. (Trecsa) duplica su capacidad de conducci\u00f3n,&#46;&#46;&#46;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5,14],"tags":[6830,1056],"class_list":["post-40092","post","type-post","status-publish","format-standard","hentry","category-actividad-productiva","category-energia-electrica","tag-mva","tag-trecsa"],"_links":{"self":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/40092","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=40092"}],"version-history":[{"count":1,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/40092\/revisions"}],"predecessor-version":[{"id":40093,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/40092\/revisions\/40093"}],"wp:attachment":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=40092"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=40092"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=40092"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}