{"id":40104,"date":"2019-10-26T11:16:17","date_gmt":"2019-10-26T17:16:17","guid":{"rendered":"http:\/\/copades.com\/monec\/?p=40104"},"modified":"2019-10-28T11:17:46","modified_gmt":"2019-10-28T17:17:46","slug":"en-operacion-nueva-red-electrica","status":"publish","type":"post","link":"https:\/\/copades.com\/monec\/?p=40104","title":{"rendered":"En operaci\u00f3n nueva red el\u00e9ctrica"},"content":{"rendered":"<p style=\"text-align: justify;\">La subestaci\u00f3n de electricidad La Vega II, que permite que funcione el segundo circuito de red de transmisi\u00f3n de energ\u00eda que va de Aguacapa a dicha subestaci\u00f3n propiedad de Trecsa entr\u00f3 en operaci\u00f3n esta semana. La obra requiri\u00f3 una inversi\u00f3n de US$1.3 millones (unos Q9.8 millones), inform\u00f3 Mauricio Acevedo, gerente general de Transportadora de Energ\u00eda de Centroam\u00e9rica S. A. (Trecsa). Con esa operaci\u00f3n se beneficiar\u00e1 a habitantes del centro y del suroriente del pa\u00eds, as\u00ed como al mercado centroamericano, ya que la subestaci\u00f3n La Vega II se conecta con la de Ahuachapan en El Salvador y forma parte del sistema principal de transporte de electricidad tanto de Guatemala como el del regional, explic\u00f3 la compa\u00f1\u00eda. La obra es de importancia para el Mercado El\u00e9ctrico Regional (MER) porque se trabaj\u00f3 con la coordinaci\u00f3n de con las comisiones reguladoras del sector tanto de Guatemala como la de la interconexi\u00f3n regional (CNEE y CRIE), los operadores del sistema el\u00e9ctrico tanto de Guatemala como de Centroam\u00e9rica (AMM y EOR) y el Instituto Nacional de Electrificaci\u00f3n (Inde) el cual es propietario en el pa\u00eds de redes de transmisi\u00f3n. (Prensa Libre 26.10.19)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>La subestaci\u00f3n de electricidad La Vega II, que permite que funcione el segundo circuito de red de transmisi\u00f3n de energ\u00eda que va de Aguacapa a dicha subestaci\u00f3n propiedad de Trecsa entr\u00f3 en operaci\u00f3n esta&#46;&#46;&#46;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5,14],"tags":[2370,1056],"class_list":["post-40104","post","type-post","status-publish","format-standard","hentry","category-actividad-productiva","category-energia-electrica","tag-mer","tag-trecsa"],"_links":{"self":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/40104","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=40104"}],"version-history":[{"count":1,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/40104\/revisions"}],"predecessor-version":[{"id":40105,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/40104\/revisions\/40105"}],"wp:attachment":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=40104"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=40104"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=40104"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}