{"id":4735,"date":"2012-11-29T16:27:21","date_gmt":"2012-11-29T16:27:21","guid":{"rendered":"http:\/\/copades.com\/monec\/?p=4735"},"modified":"2012-11-29T16:27:21","modified_gmt":"2012-11-29T16:27:21","slug":"adjudican-421-mw-para-distribuidoras","status":"publish","type":"post","link":"https:\/\/copades.com\/monec\/?p=4735","title":{"rendered":"Adjudican 421 MW para distribuidoras"},"content":{"rendered":"<p style=\"text-align: justify;\">La junta de licitaci\u00f3n, integrada por las distribuidoras <em>Energuate<\/em> y EEGSA, adjudic\u00f3 el 28 de noviembre 421 megavatios (MW), de los 600 que se hab\u00edan requerido. De las 63 empresas que adquirieron las bases de licitaci\u00f3n se recibieron 42 ofertas, que incluyeron 57 centrales de generaci\u00f3n. Seg\u00fan el informe de la comisi\u00f3n, todas las ofertas fueron declaradas solventes t\u00e9cnicamente. <strong>\u00c9rick Archila<\/strong>, ministro de Energ\u00eda y Minas, refiri\u00f3 que la licitaci\u00f3n constituy\u00f3 un \u00e9xito debido a que se adjudic\u00f3 alrededor del 80.0% de lo solicitado. \u00a0\u201cEs un proceso exitoso. Estamos hablando de US$1,200 millones para los siguientes tres a\u00f1os, situaci\u00f3n que generar\u00e1 empleo y se reactivar\u00e1n las econom\u00edas de muchos lugares, porque son proyectos que se instalar\u00e1n en diferentes sectores\u201d, dijo. \u00a0(Prensa Libre\/Siglo XXI 29.11.12)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>La junta de licitaci\u00f3n, integrada por las distribuidoras Energuate y EEGSA, adjudic\u00f3 el 28 de noviembre 421 megavatios (MW), de los 600 que se hab\u00edan requerido. De las 63 empresas que adquirieron las bases&#46;&#46;&#46;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5,14],"tags":[162,710],"class_list":["post-4735","post","type-post","status-publish","format-standard","hentry","category-actividad-productiva","category-energia-electrica","tag-eegsa","tag-energuate"],"_links":{"self":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/4735","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4735"}],"version-history":[{"count":2,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/4735\/revisions"}],"predecessor-version":[{"id":4737,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/4735\/revisions\/4737"}],"wp:attachment":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4735"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=4735"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=4735"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}