{"id":48844,"date":"2021-08-06T14:19:56","date_gmt":"2021-08-06T20:19:56","guid":{"rendered":"http:\/\/copades.com\/monec\/?p=48844"},"modified":"2021-08-07T14:23:38","modified_gmt":"2021-08-07T20:23:38","slug":"mejoraran-la-cobertura-electrica","status":"publish","type":"post","link":"https:\/\/copades.com\/monec\/?p=48844","title":{"rendered":"Mejorar\u00e1n la cobertura el\u00e9ctrica"},"content":{"rendered":"<p style=\"text-align: justify;\">La empresa guatemalteca Transportista El\u00e9ctrica Centroamericana S.A. (Trelec), dedicada a la conducci\u00f3n de energ\u00eda el\u00e9ctrica, y filial del Grupo EPM, en Colombia, inaugur\u00f3 esta semana cuatro nuevas obras en Barberena, Santa Rosa, para lo cual se requiri\u00f3 una inversi\u00f3n de Q100 millones (US $12.8 millones). Se estima que estos proyectos beneficiar\u00e1n en mejoras del suministro el\u00e9ctrico, aumento de cobertura, calidad del servicio y confiabilidad a unas 160 mil personas que radican en las \u00e1reas adyacentes a las subestaciones de Barberena, Los Esclavos y La Vega II. Adem\u00e1s, por medio de inversi\u00f3n social, se impactar\u00e1 positivamente a cerca de 45 mil personas a trav\u00e9s de proyectos de mejoramiento en infraestructura comunitaria en Barberena. Para los pr\u00f3ximos meses se espera la puesta en servicio de otras obras del Lote D del Petnac, adjudicado a Trelec en 2014 por el Ministerio de Energ\u00eda y Minas (MEM), por medio de una convocatoria p\u00fablica. Entre las cuales se cuenta la nueva subestaci\u00f3n Esquipulas, en Chiquimula, y la nueva l\u00ednea de transmisi\u00f3n Quezaltepeque \u2013 Esquipulas, que conectar\u00e1 con Quezaltepeque. De igual forma, se avanza en la construcci\u00f3n de la nueva subestaci\u00f3n Caba\u00f1as, en El J\u00edcaro, El Progreso, as\u00ed como otros proyectos en los departamentos de Chiquimula, Jalapa y Santa Rosa. (Diario de Centro Am\u00e9rica 06.08.21)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>La empresa guatemalteca Transportista El\u00e9ctrica Centroamericana S.A. (Trelec), dedicada a la conducci\u00f3n de energ\u00eda el\u00e9ctrica, y filial del Grupo EPM, en Colombia, inaugur\u00f3 esta semana cuatro nuevas obras en Barberena, Santa Rosa, para lo&#46;&#46;&#46;<\/p>\n","protected":false},"author":1,"featured_media":48845,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5,14],"tags":[105,1675],"class_list":["post-48844","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-actividad-productiva","category-energia-electrica","tag-mem","tag-trelec"],"_links":{"self":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/48844","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=48844"}],"version-history":[{"count":1,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/48844\/revisions"}],"predecessor-version":[{"id":48846,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/48844\/revisions\/48846"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/media\/48845"}],"wp:attachment":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=48844"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=48844"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=48844"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}