{"id":58553,"date":"2023-08-08T11:36:31","date_gmt":"2023-08-08T17:36:31","guid":{"rendered":"https:\/\/copades.com\/monec\/?p=58553"},"modified":"2023-08-08T11:36:31","modified_gmt":"2023-08-08T17:36:31","slug":"se-garantiza-suministro-de-electricidad","status":"publish","type":"post","link":"https:\/\/copades.com\/monec\/?p=58553","title":{"rendered":"Se garantiza suministro de electricidad"},"content":{"rendered":"<p style=\"text-align: justify;\">La Empresa El\u00e9ctrica de Guatemala, S. A. (EEGSA) dio a conocer que por medio de una subasta inversa electr\u00f3nica en la licitaci\u00f3n PEG-4-2022 se contrataron 235 megavatios (MW) de energ\u00eda y potencia para iniciar el abastecimiento y garantizar el suministro de 2026 a los pr\u00f3ximos 15 a\u00f1os. A ese respecto, el subgerente de Regulaci\u00f3n, <strong>Josu\u00e9 Figueroa<\/strong>, refiri\u00f3 que la compra en el proceso de adjudicaci\u00f3n alcanz\u00f3 un precio promedio por megavatio de Q709.34 (US $89.79) y del total, 16 empresas participantes fueron concedidas, entre las que destacan las tecnolog\u00edas en energ\u00eda hidroel\u00e9ctrica, e\u00f3lica, solar, biomasa y gas natural. \u201cLas centrales de generaci\u00f3n contratadas, como resultado de la PEG-4-2022, contribuir\u00e1n a la transformaci\u00f3n de la matriz energ\u00e9tica nacional hacia una m\u00e1s limpia, adem\u00e1s, permitir\u00e1n tarifas m\u00e1s competitivas y promover la estabilidad del sector en el pa\u00eds\u201d, se\u00f1al\u00f3 Figueroa. La firma <em>Quantum America<\/em> fue la administradora de la subasta inversa y se necesitaron 37 rondas para alcanzar el mejor precio por megavatio, indic\u00f3 la mencionada distribuidora. Asimismo, se\u00f1al\u00f3 que se cont\u00f3 con la presencia de representantes del Consejo de la Industria El\u00e9ctrica, Asociaci\u00f3n de Generadores con Energ\u00eda Renovable, entre otros, quienes avalaron que el asunto fuera transparente y cumpliera con los criterios de las bases de licitaci\u00f3n. (Diario de Centro Am\u00e9rica 08.08.23)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>La Empresa El\u00e9ctrica de Guatemala, S. A. (EEGSA) dio a conocer que por medio de una subasta inversa electr\u00f3nica en la licitaci\u00f3n PEG-4-2022 se contrataron 235 megavatios (MW) de energ\u00eda y potencia para iniciar&#46;&#46;&#46;<\/p>\n","protected":false},"author":1,"featured_media":58554,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[14],"tags":[],"class_list":["post-58553","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energia-electrica"],"_links":{"self":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/58553","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=58553"}],"version-history":[{"count":1,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/58553\/revisions"}],"predecessor-version":[{"id":58555,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/58553\/revisions\/58555"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/media\/58554"}],"wp:attachment":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=58553"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=58553"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=58553"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}