{"id":61057,"date":"2024-04-26T09:30:53","date_gmt":"2024-04-26T15:30:53","guid":{"rendered":"https:\/\/copades.com\/monec\/?p=61057"},"modified":"2024-04-26T09:30:53","modified_gmt":"2024-04-26T15:30:53","slug":"inicia-la-construccion-de-synergy-industrial-park-con-una-inversion-us20-millones","status":"publish","type":"post","link":"https:\/\/copades.com\/monec\/?p=61057","title":{"rendered":"Inicia la construcci\u00f3n de Synergy Industrial Park, con una inversi\u00f3n US$20 millones"},"content":{"rendered":"<p style=\"text-align: justify;\">Con una inversi\u00f3n inicial de m\u00e1s de US$20 millones y 500 hect\u00e1reas de construcci\u00f3n inicial, ayer dieron inicio las obras de <em>Synergy Industrial Park<\/em>, recinto que forma parte de un proyecto que en total abarcar\u00e1 4 mil 700 hect\u00e1reas en el kil\u00f3metro 53 de la carretera al Pac\u00edfico, impulsado por las compa\u00f1\u00edas Spectrum y Grupo Pantaleon. En el acto de colocaci\u00f3n de la primera piedra participaron el presidente de la Rep\u00fablica, <strong>Bernardo Ar\u00e9valo<\/strong>, as\u00ed como <strong>Ramiro Alfaro<\/strong>, gerente general de Spectrum; <strong>Abraham Rivera<\/strong>, alcalde de Escuintla; <strong>Diego Herrera<\/strong>, CEO de Grupo Pantale\u00f3n y presidente de la junta directiva de Spectrum; y <strong>Alejandro Guill\u00e9n<\/strong>, gerente de negocio industrial de dicha firma. Este proyecto es parte de un master plan m\u00e1s amplio en el cual se desarrollar\u00e1n vivienda, comercio, hoteles, entretenimiento, \u00e1reas verdes, hospitales, universidades, colegios, entre muchos otros usos, explicaron las empresas. Solo el parque industrial cuenta con 500 hect\u00e1reas de terreno (715 manzanas) ubicadas en el municipio de Escuintla, que se destinan a empresas de log\u00edstica y manufactura o producci\u00f3n, lo cual facilita el acceso a mano de obra calificada y una conectividad log\u00edstica fluida. (Prensa Libre 26.04.24)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Con una inversi\u00f3n inicial de m\u00e1s de US$20 millones y 500 hect\u00e1reas de construcci\u00f3n inicial, ayer dieron inicio las obras de Synergy Industrial Park, recinto que forma parte de un proyecto que en total&#46;&#46;&#46;<\/p>\n","protected":false},"author":1,"featured_media":59418,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[928],"tags":[],"class_list":["post-61057","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-inversion-extranjera-actividad-productiva"],"_links":{"self":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/61057","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=61057"}],"version-history":[{"count":1,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/61057\/revisions"}],"predecessor-version":[{"id":61058,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/61057\/revisions\/61058"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/media\/59418"}],"wp:attachment":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=61057"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=61057"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=61057"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}