{"id":62586,"date":"2024-10-24T11:38:27","date_gmt":"2024-10-24T17:38:27","guid":{"rendered":"https:\/\/copades.com\/monec\/?p=62586"},"modified":"2024-10-24T11:38:27","modified_gmt":"2024-10-24T17:38:27","slug":"preparan-bases-para-licitacion-energetica","status":"publish","type":"post","link":"https:\/\/copades.com\/monec\/?p=62586","title":{"rendered":"Preparan bases para licitaci\u00f3n energ\u00e9tica"},"content":{"rendered":"<p style=\"text-align: justify;\">Los t\u00e9rminos de referencia para licitar m\u00e1s energ\u00eda el\u00e9ctrica est\u00e1n en su fase final y ser\u00e1n publicadas este mes, confirm\u00f3 ayer el presidente de la Comisi\u00f3n Nacional de Energ\u00eda El\u00e9ctrica (CNEE), Luis Ortiz. Este ser\u00e1 el concurso m\u00e1s grande que se lleva a cabo por parte de las tres compa\u00f1\u00edas distribuidoras, pues se prev\u00e9 asegurar m\u00e1s de 1 mil 200 megavatios que permitan suplir el suministro establecido en contratos que vencer\u00e1n en 2030. A partir de la oficializaci\u00f3n de las bases, el proceso podr\u00eda demorarse entre seis meses y un a\u00f1o. Sin embargo, el funcionario explic\u00f3 que la CNEE se ha propuesto que el plazo no exceda el medio a\u00f1o. Lo m\u00e1s importante para Guatemala es que se espera que participen m\u00e1s compa\u00f1\u00edas generadoras de energ\u00eda limpia o renovable y que utilicen nuevas tecnolog\u00edas. Por consiguiente, tambi\u00e9n el pa\u00eds recibir\u00e1 m\u00e1s inversiones en este subsector, seg\u00fan Ortiz. Este evento internacional es lo que se ha denominado Plan de Expansi\u00f3n de Generaci\u00f3n (PEG-5). (DCA 24.10.24)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Los t\u00e9rminos de referencia para licitar m\u00e1s energ\u00eda el\u00e9ctrica est\u00e1n en su fase final y ser\u00e1n publicadas este mes, confirm\u00f3 ayer el presidente de la Comisi\u00f3n Nacional de Energ\u00eda El\u00e9ctrica (CNEE), Luis Ortiz. Este&#46;&#46;&#46;<\/p>\n","protected":false},"author":1,"featured_media":59166,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[14],"tags":[],"class_list":["post-62586","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energia-electrica"],"_links":{"self":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/62586","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=62586"}],"version-history":[{"count":1,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/62586\/revisions"}],"predecessor-version":[{"id":62587,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/62586\/revisions\/62587"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/media\/59166"}],"wp:attachment":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=62586"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=62586"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=62586"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}