{"id":67461,"date":"2025-10-16T06:37:11","date_gmt":"2025-10-16T12:37:11","guid":{"rendered":"https:\/\/copades.com\/monec\/?p=67461"},"modified":"2025-10-16T06:37:19","modified_gmt":"2025-10-16T12:37:19","slug":"rechazan-oferta-en-transmision","status":"publish","type":"post","link":"https:\/\/copades.com\/monec\/?p=67461","title":{"rendered":"Rechazan oferta en transmisi\u00f3n"},"content":{"rendered":"<p style=\"text-align: justify;\">\u201cDe manera un\u00e1nime, la Junta Calificadora determin\u00f3 que la oferta t\u00e9cnica presentada no es solvente\u201d, manifest\u00f3 <strong>Marvin Barreto<\/strong>, presidente de esta instancia respecto de la propuesta de la Empresa de Transporte y Control de Energ\u00eda El\u00e9ctrica (Etcee), de la estatal Instituto Nacional de Electrificaci\u00f3n (INDE), para ejecutar las obras contenidas en el Plan de Expansi\u00f3n de Transmisi\u00f3n (PET-3). El ministro de Energ\u00eda y Minas, V\u00edctor Hugo Ventura, indic\u00f3 que esta decisi\u00f3n se debe a aspectos jur\u00eddicos. Esta resoluci\u00f3n fue dada a conocer durante la reuni\u00f3n de la Junta Calificadora con miembros del Ministerio de Energ\u00eda y Minas, as\u00ed como de la Comisi\u00f3n Nacional de Energ\u00eda El\u00e9ctrica donde se efectuar\u00eda la apertura a la plica econ\u00f3mica presentada por el oferente. Ventura enfatiz\u00f3 que a la brevedad lanzar\u00e1n una nueva licitaci\u00f3n.\u00a0(DCA 16.10.25)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u201cDe manera un\u00e1nime, la Junta Calificadora determin\u00f3 que la oferta t\u00e9cnica presentada no es solvente\u201d, manifest\u00f3 Marvin Barreto, presidente de esta instancia respecto de la propuesta de la Empresa de Transporte y Control de&#46;&#46;&#46;<\/p>\n","protected":false},"author":1,"featured_media":48376,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[14],"tags":[],"class_list":["post-67461","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energia-electrica"],"_links":{"self":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/67461","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=67461"}],"version-history":[{"count":1,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/67461\/revisions"}],"predecessor-version":[{"id":67462,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/posts\/67461\/revisions\/67462"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=\/wp\/v2\/media\/48376"}],"wp:attachment":[{"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=67461"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=67461"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/copades.com\/monec\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=67461"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}